As part of this transformative venture, the project requires the development of a robust engineering design for its haul roads and bulk earthworks. These designs will facilitate efficient mining operations and contribute to the seamless transportation of extracted materials. Additionally, the scope includes designing drainage infrastructure, structures, early works construction roads, laydown areas, and conducting a concept study for the upgrade of Beyla airport, all essential to the success of this mega project.